Malbank Waters, Nantwich

  • 41 affordable homes provided at a cost of £1,630,000
  • Provision of green spaces and a play area for public use.
  • Highway improvement works along Welsh Row.
  • £77,000 contribution made by Barratt Homes towards canal towpath improvements.
  • £146,000 contribution made by Barratt Homes towards primary education.
  • £25,000 contribution made by Barratt Homes towards footpath and cycleway improvements.
  • £5,000 contribution made by Barratt Homes towards level crossing improvements.
  • £117,500 contribution made by Barratt Homes towards construction of a link road between Taylor Drive and Edmund Wright Way.
  • Over 85% of construction waste re-used or re-cycled.
  • Barratt Homes (Manchester) is ISO 14001 and 18001 accredited.
  • Awarded 5 star status by HBF after an independent survey of customers